Showing posts with label Teak Deck. Show all posts
Showing posts with label Teak Deck. Show all posts

Monday, 16 July 2012

New Year's Resolution 2012

The New Years resolution for this year was to finish the deck. The weather has contrived to ensure that it is still not finished. but progress is being made.

Here's the Starboard side deck; plugged; rough sanded; caulked and in the process of trimming.

At least it sort of looks like a teak deck now, and it pretty much weather-proof (in parts.)

Trimming the SABAcaulk a week after laying is hard work. It said on the blurb that it could be trimmed and sanded two days after glopping into the seams. But I feel it needs longer.

So: trimming is a slow but sure job.

The seams are cleaned out; primed; breaker tape applied in the bottom and then caulk is squidged in with the sausage gun by hand. I had thought of an air squidger, but by the time the compressor has been brought out and wired up - it will have started raining again - so by-hand it is.

The tools in the shot are:-

  • Kerschen 32mm Firmer Chisel - very sharp (best to keep behind the business end)
  • 120 grit paper and heavy sanding block
  • Model Maker's Razor plane (useful at times)
  • Best of all - a Veritas Cabinet scraper.
  • Not shown - old file  - the safe edge of which is used for burnishing the cabinet scraper

I promise the next and last shot of the deck will be it finished. I just hope that it is this year.

Don't hold your breath ...


[Now Playing:  It's Raining Again by Supertramp ]

Wednesday, 30 November 2011

Winter Drawers On

So, the end of November is upon us (and still no offers of Pantomime).

Here is the final shot of the deck for the year. Five strakes reach from stem to stern, with more than a few yet to fit. The side decks are almost complete, two bits of teak on each side would have completed them, but the temperature is getting too low for the glue to cure quickly and the rising humidity will also cause problems.

Its time to fit the winter cover and hibernate in the workshop to finish the galley cabinetry, fit the fridge; cooker and sink and get those engines reassembled.

Every time I meet a friend, the usual first question is; "when are you launching the boat?" I usually reply, "Two more years". Looking at the To-Do list; there's the deck still to finish; the windows to refurbish and refit; the engines to rebuild and the gearboxes to check over. The wiring needs total replacement and the galley and heads compartments aren't compartments at all, they're just big areas of boat.

and then there's all the little jobs...

Who'd have thought a teak deck would have taken so long and so much hassle. Hey-ho, you live and learn.

Right - off to the shed to start clearing it out ready for carpentry operations.

[Now Playing: And Winter Came by Enya]


Tuesday, 1 November 2011

Laying up supper; GMT and Halowe'en

Not much blogging lately. There's been steady progress on the deck, but I guessed you'd all be bored witless by yet another picture of what looks ostensibly like the same piece of deck.

The unseasonable weather for October started with temperatures in the 80's and a trip on the P.S. Waverley from Whitstable to Tower Pier as a 21st Wedding Anniversary treat for the long suffering SWMBO. But the rest of the month meant that most days a strake or two could be glued down. I'm getting to the awkward pieces now - spiling into the cabin side and odd short lengths on the foredeck means that each strake takes about two hours to lay. Compare this with earlier in the job and four planks at a time fitted and glued in a single session of about 3 hours. Oh well.

Saturday was our club AGM and laying up supper at a sailing club on the Hamble. Most enjoyable to meet like minded nutters and remind oneself why one spends so much time restoring these old beasts.

A slight shock on Sunday as the most of the clocks in the house set themselves back an hour - the cooker and heating system didn't manage it of course, and now it's dark at five PM and time to hibernate in the workshop - which is unfortunately a total tip, filled with short ends of teak and glue boxes and... I suspect the next rainy Sunday afternoon is reserved for mucking the place out.

Time, I think, to start concentrating on the electrical drawings and finalising the circuit specifications - but first, a cup of tea...

[Now Playing: And Winter Came by Enya]


Monday, 3 October 2011

Mambo No. 4


Crunch time. As per previous posts, it has become blatantly obvious that there was no way that 45mm wide teak strakes were going to bend to the original curve used by Fairey Marine. You can see the traces of the old planks - they're the black marks in the sub-deck.

So, a decision was taken to reduce the sweep somewhat, but keep the original style of planking, i.e. butting into the flared king-plank.

The photo shows the port hand strake (No 4) persuaded into position with blocks on the deck; screws and penny-washers and a ratchet load strap to control the edge set.

One fine day in early October (temperature in the high 70's) Both number 4 strakes were laid; machined and glued down.

Of course No. 3 needs to be completed, and then the pieces of 1 and 2 fitted, but I'll leave those for another day.

On the basis that I've used up one of my two boxes of glue I am assuming that I've completed about 50% of the deck. I'm hoping that it's slightly more.


[Now Playing: Tourniquet by Evanescence]



Monday, 26 September 2011

Getting there.

After two weeks of dodging the weather, the deck is progressing forwards. i.e there is more teak on the foredeck than there was.

It's like one of those difficult jigsaw puzzles, you can get so many bits in place, then you have to sort out an awkward piece before you can do some more. The awkward pieces in this case are on the foredeck where the edge set is greatest.

Fairey Marine must have steamed the teak in one of their autoclaves and then probably bent them on a jig to get the set. They probably used a thicker piece of wood and then once bent, sawed them into strips about 65mm wide and 10mm thick.

The photo shows a typical Huntsman deck on Fordsport 707. I can tell you that that bend cannot be done with dry teak even 55 mm wide. Steaming the strakes just mean they are slightly easier to handle into place and will retain the set afterwards, it doesn't seem to allow them to bend much further - at least with my steaming gear.

So, options: Lessen the sweep or invest in a bigger kettle.

Once I can get some of the foredeck strakes in place, I can finish the side decks, which look quite good.

The fight continues...


Friday, 2 September 2011

Sticking to it

Right, stop messing about in boats and get back to messing about with boats.

The rally season is pretty much at an end for the small boats, and of course the weather will now improve as the kids go back to school.

Time now to get back down to the important stuff like laying teak decks.

I expect you're all bored silly by this project, but for those who are still with me; I managed over a few evenings this week to get teak glued to deck. The whole of the aft deck is glued down and the port quarter likewise. The next phase is the starboard quarter and then it's time to tackle the hard bits at the front.

The main problem with this stage is that the glue gets everywhere and makes the whole job look a mess, until its plugged and caulked and sanded.


[ Now Playing One Piece At A Time by Johnny Cash ]

Tuesday, 12 July 2011

The Aft Deck

The port aft deck.
One of the more fiddly areas is the aft deck. Lots of short pieces to cut and fit, each one taking about 20 minutes once the process is refined.

The upside of small pieces is that lots of short ends can be used up, along with the earlier failures and very occasional poor quality strake (just one so far).

The most useful tools for this job are: a decent cabinet maker's screwdriver; Starretts jig-saw blades which cut on the up and down-stroke and a 5mm drill which is not used to drill holes. Perhaps more on these later.

Just to be pedantic; there are eight separate processes:

  1. Measure and cut the piece to rough length
  2. Cut the mitre and bevel into the aft cabin panel
  3. Pick up the aft profile from the margin piece and cut.
  4. Lay in position and mark for at least two screws (three as you work into the middle of the deck)
  5. Accurately profile to the margin and any rosettes, and cut
  6. Counter bore the screw holes
  7. Open up the counterbores to 9.5mm for the plugs
  8. Screw down

and of course, it'll all have to come up again to prep the deck and glue down.

[Now Playing: Absolutely Nothing - I'm too busy concentrating]


Monday, 27 June 2011

Too Hot to Glue

Hottest day of the Summer so far, and summer is only 4 days old in EU terms.

Too hot to glue after about 11am, so made a start on the starboard quarter deck. The margins were already in place (see Time for Thought)  so started on the strakes. These can be pulled into place by hand so don't require steaming. With the help of a couple of finger clamps and two self tapping screws and washers, they stayed put long enough to drill for the No. 6 brass screws. Once fitted, they are removed to machine the counter bores and trim the butt joins to give a 5mm gap which matches the rebate on the strake edges.

The bevel to the transom margin was easier to mark than I'd anticipated. I thought I might have to remove the margin piece.

The outer strake is 10 foot long, is cut to work round the cleat rosettes so probably stretches a little further. The second strake is about 3/4 length; the third 1/2 length etc. This ensures that the butt joins in the strakes are well spaced.

Strake number 5 has to fit round the cabin side and butt up against the transom margin - that will be interesting...

[Now Playing: Laid Out (Fully Horizontal Mix) by Danny Howells

Monday, 13 June 2011

Slow Progress

A frustrating week with real work and the weather getting in the way of progress. But a few odd jobs have been completed: here's the deck strake jig with its clamp blocks and fingers finished, stuck in the garage pending 3 hours without rain at the right time.

The other job which is small enough to fit in the workshop is the cool box for the galley. 5 bits of 9mm ply epoxied together to take the Cold plate of the chiller system. It's about half complete (photo in the gallery)

We did have a great day at the Beale Park Boat show though, always worth a visit for a nice day out by the water.

Now, back to work...

[Now Playing: Frustration by Soft Cell ]


Friday, 3 June 2011

Twist and Shout

After my first attempt at steaming and fitting a teak deck strake, it became blatantly obvious that its:

a) hard work and

b) likely to do a lot of damage to existing deck components.

So I started scheming out a jig. After all, Fairey Marine used to supply a set of teak deck parts pre-steamed for customers to add to their kit boats. I bet they used a jig.

The Solution so far is a 8' x 2' sheet of 3/4" spruce plywood from "B&Q" and some 2" x 1" screwed and glued around the edge as a frame to stiffen the whole lot up. Add a coat of Homebase's finest white paint so I can see the lofting lines.

The curve of the strakes was easily traced from the old sub-deck as the lines of the old planks were visible due to the discolouration of the plywood caused by water leaking between the planks over the years. A few panel pins and my trusty lofting batten.

The next job is to make up the clamp blocks so the teak strakes can be manipulated (in pairs) to the correct curve.

More later...

[Now Playing Twisted by Katie Melua]

Tuesday, 17 May 2011

Time for Thought.

At the end of week 5 (I think), the margins are in place, the remedial glass work has been done on the cabin/deck seam and the steam box has been constructed.

The photo shows the foredeck with all the margins screwed down and the rebates cut (by hand using a shoulder plane from Axminster)

The big gap in the port king-plank will eventually be filled with a 40mm thick lump of teak, on top of which will sit  the anchor winch.

Unfortunately, due a slight teething problems with the steam-box, I had trouble bending the first deck strake into position. It should appear on the left of the photo above, but...

...but hey, Edison spent years discovering ways of not making light bulbs. I think that what I thought would be the hot end of the steam-box is actually colder than the cold end. I have to wait for 'er-indoors to go to Waitrose so I can borrow the jam making thermometer.

Time for thought. For the moment, I'll work on glueing down the margins and working on a jig so the strakes can be bent into position without damaging what I've done already. If you look closely at the photo, you'll see the outlines of the old planks in the subdeck; it's quite a curve - about 12" of edge-set over 8 feet of plank. (that's 300mm over 2.4 metres in new money.)

[Now Playing: Taking Over Me by Evanescence]

Thursday, 28 April 2011

Plugging away


It doesn't take very long when cutting out the various margin pieces of a teak deck before you're knee deep in offcuts. Of course, some of the pieces are large enough to keep for later, but as the bits get ever smaller, sooner or later they finish up in the bin. Which is irritating. I can't stand throwing anything away.

It also became apparent that the 400 brass screws I'd bought to fix the deck pieces down with, were fast disappearing - into the deck. Each one requiring its hole counterboring and then plugging. Checking out the price of 3/8" diameter teak plugs, they are currently working out at 5 or 6 quid a hundred.

So the current regime is, having purchased a 3/8" Veritas plug cutter from The Axminster Tool Centre, an hour each evening is spent cutting plugs out of scrap teak and storing them in a tub. Its amazing how small a piece of teak you can get a plug out of if you're really tight like me. I can cut about 50 an hour, so it'll take a week or so and there's nothing on the telly at this time of year.

[Now Playing: "Layla (unplugged)" by Eric Clapton]

Tuesday, 26 April 2011

Teak Deck - end of week two

So with the foredeck margin boards in place, work moves to the blunt end of the boat.

The aft deck layout is quite busy, with cleats, davit bases and the stern ladder all to work around. (The original layout didn't have Davits, but did have quarter rails.)

This is the first time the stern ladder rails have been fitted to the hull since about 2005.

You can see from the cleats in the photo that there is a fair camber to the deck ( there's a bit of distortion from the 17mm lens ), therefore the davit bases will need to be wedged up so that the davits themselves will be upright. Across the diameter of the davit base there's a drop of 12mm - a couple of plywood wedges painted black might work...

Due to a slight miscalculation on the ordering front, I have run out of 90mm wide teak boards. So it's back to Howells and Son for a couple more.

[ Now Playing: Teak Forest Mist by the Thai Elephant Orchestra]

Monday, 11 April 2011

Can't put it off any longer

Finally, the weather has set fair enough to make a start on laying the teak deck. The materials are in stock and I think I know what I'm doing.

Unlike most decks, where the king-plank goes in last, the Fairey Huntsman's deck layout requires it to be fitted first. The most expensive bit of wood and you have to get it right first time. It is made up of two pieces of teak 120mm wide and 2 metres long. Specially cut by K.J. Howells and Son of Poole.

The first photo shows progress during day two. The two king-plank boards are screwed down, and the bow margin boards in position awaiting profiling to the bow shape. As I've nowhere to put the bow rail and it's required to hold up the tarpaulin frame, I'll be working round it.

The second photo is a closeup of the marking gauge needed to find the edge of the deck under a 9mm thick teak plank. It picks up the edge of the rubbing strake and marks the edge of the deck and also the 75mm margin board width. Due to the fact that a 40 year old rubbing strake is not the most reliable positioning agent, the marking gauge is adjustable. The most important aspect of the device is the plastic DALEK fitted to the top of the pencil. It stops the pencil from rolling off the deck every time you put it down. (For the record, I have a TARDIS on my other pencil).

The next job is the margin boards around the edge of the deck and various deck fittings so I hope this weather holds for a while longer.

[Now Playing: "Slow Down" by the Teak Project]

Tuesday, 22 June 2010

Hit the Deck!

Finally - it seems like years - I've finished the bottom of the boat. All fastenings changed; screw heads filled; painted; faired and painted again.

OK, so theres a few small areas to do where the jacks are. I can move them in a week or so when the primer has hardened, but they're small beer compared with working on a whole side.

Now to concentrate on the topsides while the British summer is here: The windscreen frame needs cleaning back to bare wood and requires some repair work before painting. Then its finishing the cabin sides, some filling still to do, then painting.

And then its the new Teak deck.

I've been umming and ahhing over using a fake teak for a couple of years. There are about a dozen or so variants from Flexi-teak to Aikona to loads of others. I decided to wait and see how others got on with the stuff. I didn't like the soft ones as they don't support deck fittings too well and crush easily when the sister-in-law turns up in stilettos. Then some of the guys started to report massive movement with the hard fake teaks due to temperature fluctuations.

All in all it looks like real teak will have to be the answer. So now to decide whether to go down the WEST Epoxy and 6mm thick planks or a more traditional layup with 10mm thick planks on a flexible adhesive.

Decisions decisions...